Palazzo Designer Homes  contracted us to install and pump formwork for this luxury factory unit located in the rapidly growing suburb of Prestons.

Timeframe played a significant role in this project; the client required the build to be completed within a strict schedule.

The client required the build to be completed within a strict schedule.

THE RESULT

Collaborating with the client, architect and other contractors, we were able to effectively address the physical and logistical challenges of the project.

The entire team worked together efficiently to meet the client’s deadline, finishing the project within just five days.

FEATURED PROJECTS

Twyford Hall

Merimbula, NSW


Putney

Putney, NSW


Kogarah

Kogarah, NSW


Sydney Petroleum

Kurri Kurri, NSW


Caringbah

Caringbah, NSW


Palazzo Homes

Prestons, NSW


Lumia Projects

Silverwater, NSW


Unify

Harris Park, NSW



Lumia Projects

THE PROCESS

In December, 2016, Murs Projects PTY LTD  was contracted by Lumia Projects  to construct a 3 storey townhouse and associated infrastructure, located in Silverwater; 20 kilometres west of the Sydney central business district on the southern bank of the Parramatta River.

Due to timeframe and budget constraints, the project required a collaborative, proactive and flexible approach.

THE RESULT

Due to timeframe and budget constraints, the developers required a collaborative, proactive and flexible approach. Murs Projects PTY LTD  were able to meet all of the client’s needs, including effectively working with the tight access restrictions.

FEATURED PROJECTS

Twyford Hall

Merimbula, NSW


Putney

Putney, NSW


Kogarah

Kogarah, NSW


Sydney Petroleum

Kurri Kurri, NSW


Caringbah

Caringbah, NSW


Palazzo Homes

Prestons, NSW


Lumia Projects

Silverwater, NSW


Unify

Harris Park, NSW



Unify

THE PROCESS

Murs Projects PTY LTD  was contracted for this unique enterprise after a competitive tendering process. Ultimately our strong relationship with Unify Constructions based on experience and a dedicated, ongoing commitment to their client’s expectations, provided Murs Projects with the opportunity to deliver this new level in construction for Harris Park; a stylish building comprised of eight units.

The construction process presented specific challenges due to the existing power lines and the site location on a busy intersection of a significant transport route.

Powerlines and the high level of traffic in the area presented a number of challenges.

THE RESULT

As part of a strategy with managing these challenges, we staggered deliveries of materials and labour resources to minimise the risk to program whilst also being flexible to manage a number of changes throughout the construction process.

Full perimeter scaffold systems were progressively installed and modified to provide safe working access around the site.  A continuous process of regular meetings between the client and Murs Projects resulted in the safe delivery of a quality product whilst also managing value and staying within budget.

FEATURED PROJECTS

Twyford Hall

Merimbula, NSW


Putney

Putney, NSW


Kogarah

Kogarah, NSW


Sydney Petroleum

Kurri Kurri, NSW


Caringbah

Caringbah, NSW


Palazzo Homes

Prestons, NSW


Lumia Projects

Silverwater, NSW


Unify

Harris Park, NSW



Savvy Group Constructions

THE PROCESS

Murs Projects PTY LTD  was engaged by Savvy Group Constructions to install and pump the world renowned Ritek® XL Wall®, with associated infrastructure, located in busy Newtown. There were challenges due to the restricted access of the site.

THE RESULT

Murs Projects PTY LTD  collaborated with the client and design team as a managing contractor addressing the physical and logistical challenges of the project. Strategic selections of major building elements allowed for rapid progress on site.

Programming solutions involved staging the project carefully to avoid building ourselves out by working from the back to the front in sections allowing for trades to complete each stage effectively and efficiently throughout the project.

We’re happy to report that weather permitted us to deliver the project on time without any setbacks. Additionally, we stayed within budget and further developed our positive working relationship with the client.

FEATURED PROJECTS

Twyford Hall

Merimbula, NSW


Putney

Putney, NSW


Kogarah

Kogarah, NSW


Sydney Petroleum

Kurri Kurri, NSW


Caringbah

Caringbah, NSW


Palazzo Homes

Prestons, NSW


Lumia Projects

Silverwater, NSW


Unify

Harris Park, NSW